The Pads
   

 Before
8/2/02

 The Skid Steer
8/2/02

 At maximum depth
8/2/02

 Pulling out dirt
8/2/02

 Clearing the auger
8/2/02

 27in diameter, 5ft deep
8/2/02

 Negotiating the switchback
8/2/02

 Backing towards the site
8/2/02

 Ready to pour
8/2/02

 Pouring
8/2/02

 Setting the rebar
8/2/02

 Ready for J-bolts
8/2/02

 A finished pad
8/3/02

 After
8/3/02